Home / News / Installation steps for the tent

News

Installation steps for the tent

The installation steps for the tent are as follows:
Installation: (The tools that the customer needs to prepare before installation: two ladders, two adjustable wrenches, two hemp ropes <30 meters>, 50 meters tape measure.)
The first step: positioning the column bottom plate
First determine the ground level of the installation site, and then position the bottom plate. The distance from the center of the bottom plate to the center of the bottom plate is 15 meters in the longitudinal direction and 5 meters in the horizontal direction. Because this tutorial is based on a tent with a span of 15 meters, the longitudinal distance is 15 meters. The horizontal direction is the length direction of the tent, which can be extended infinitely by a multiple of 5 meters. Note that it must be a center-to-center distance. After determining the position of the four base plates, then measure whether the distances of the diagonal lines are equal. If you are not equal, you must re-adjust the position. Make sure that it is a rectangle instead of a parallelogram. After the position is fixed, the bottom plate of the column is fixed at the corresponding four positions (for the fixing method, see the third section of this article: the fixing measures of the tent). The same method fixes and fixes the other base plates in the length direction.
Step 2: Place the parts
The column, the corner node, the inclined beam A section, the oblique beam B section (two oblique beams are required for the span of more than 14 meters), and the inclined beam receiving parts (for the oblique beam A section and the oblique beam section B, 14 There is no such part below the span of the meter. The top node is placed as shown below. All the components form a gable, which is the so-called span-shaped chevron frame. Place the other gable parts on the same principle, and be sure to lay them flat on one side in one direction.
Step 3: Connect the inclined beam A/B section
Insert the inclined beam A into the inclined beam receiving part of the oblique beam B section (we will assemble the inclined beam receiving part to the oblique beam B section when we package), and insert two screws (Note: the small hole is not installed first) Screw)
Step 4: Install the top node
Connect the connected section of the inclined beam AB to the top node, pry the screws in and tighten. If it is the first gear, you must install the wire cable, and install the buckle on one end of the wire cable without the cable on the second hole of the B section of the diagonal beam, as shown below: 拴 screw, slightly tighten the nut, Make sure that the buckle seat is free to rotate
Note: When inserting the screws, note that the screw rods are generally facing the inside of the tent, and the first gable is opposite to the screw of the second gable. In particular, the installation direction of the wire cable must be relative, only When the gable is erected, the wire rope can be pulled. Use this method to install all the top nodes and the inclined beam AB segments.
Step 5: Install the corner node
Insert the oblique end of the corner node into the section A of the diagonal beam, and connect the upper end of the column to the straight end of the corner node, while threading the screw and screwing on the nut.
Note: If installing the wire cable and the cross bar, install the screw on the hole above the diagonal end of the corner node, and install the screw on the hole below the straight end of the corner node. The same method is used to install other corner nodes.
Step 6: Connect the column to the bottom plate
Align the lower insert hole on the post with the screw on the bottom plate and tighten the nut. The same method is used to connect the other column base and column. Note that the entire installation process must be handled with care, and it is necessary to use the wooden side to pad the assembled gables. When moving the aluminum, be sure to lift the entire frame to avoid the sand and other materials on the ground and the aluminum. Friction of the article causes scratches on the surface of the aluminum. In addition, you can install the column and the bottom plate before installing the column and corner joints. The effect is the same. After assembling all the gables, place a ladder (letter ladder) next to the floor on both sides of the first gable to erect the gable and install the crossbar, prepare the screws and wrenches and personnel, and lift the crossbar to the column. Beside the side. It is best to install more than 12 people in a tent with a span of 15 meters to prepare for all work and then enter the vertical gable.
Step 7: Vertical gable
All the personnel were divided into four teams. Two people pulled the wire rope and two people stood at the corner node. The others stood at the apex and lifted the gable up. After lifting to a certain height, the middle people ran to the sides to help the gable. Continue to lift up. The person pulling the wire rope should also pull the gable up.
When the entire gable is up to 70 degrees, it must be stopped, and then slowly erected perpendicular to the ground. At this time, the person pulling the wire rope, while standing a little, will stabilize the top. At the same time, several people have to hold the column. Two people installed the flat iron end of the crossbar on the screw below the upper end of the column and tightened the nut. Connect the other end of the crossbar to the lower hole on the bottom plate of the adjacent second gable, thread the screw and tighten the nut. It should be noted that the bottom plate must be fixed in advance, otherwise the bottom plate will move when the gable is pulled up. Use the same method to erect the second gable and install the other two crossbars. As shown below: The two gables after the crossbars are installed can be completely loose.
Step 8: Install beams and beams
The cross-sectional shape of the beam is house-shaped, and the cross-sectional shape of the beam is square. The installation method is as follows. The hook end of the beam or the beam is turned upward, and then the hook end is tilted at an angle to the U-shaped ear on the corner node or the π-shaped iron on the inclined beam. Use a ladder to slowly lift the straight hook end of the beam/strip and hang it into the gable of the gable or the corner of the corner node on the opposite side of the hook. In general, there are three beams between the two gables, one at each end and one on the top, and the crowbar increases or decreases according to the size of the span. Hang all the beams and purlins of the first gear. Take the 15-meter span as an example. You need to hang three beams and four beams. Then, the wire rope is staggered and pulled to the first hole of the corner node, and tightened. When tightening the wire rope, the wire rope at the upper end of the cable must be fixed, and the wire rope is also prevented when the cable is rotated. Rotate. Use the same method to erect other gables and install beams. Since the middle gable surface is not equipped with wire ropes, it is necessary to tie the top node with the hemp rope to pull and stabilize the gable. Beams and beams must be installed immediately for each gable.
Large exhibition tent ninth step: installation support
Connect the middle bracket to the small hole in section A of the diagonal beam and insert the screw to tighten the nut. After installing the middle support, hang the side beams on the corner joints and the mounting ears of the middle support. Note that when hanging the side beam, you must first install it from the side beam fitting end. First, hang the side beam fitting end into the mounting ear in the corner node, then slowly lift the straight hook end and install it to the middle support. In the ear, remember not to install the straight hook end first, otherwise the installation is not successful. As with the beam and the purlin, it must be installed from the hook end and then the straight hook end.
Step 10: Install the cloth top
Put the belt at both ends of the cloth top into the hemp rope and pull it toward the inside of the tent. Then insert the rubber strips on both sides of the top end of the cloth into the groove of the inclined beam, and the other end of the hemp rope is slid across the entire frame of the tent, and then the four people pull the hemp rope at the same time, so that the top of the cloth is along the inclined beam. The groove is slowly pulled to the opposite side. Remember to pull hard at the same time, otherwise the top of the cloth will get stuck and cause it to pull. To solve this problem, just pull the top of the cloth back to a certain position and then pull it again at the same time. The same method is used to pull the other cloth tops.
Step 11: Install the side triangle
It is also necessary to use the hemp rope to pull the top of the cloth. However, when installing the side triangle, someone must stand (use the high ladder) to pull the rope next to the top node. The only difference is that the side triangle pull belt is outside. First insert the side triangle into the slot of the diagonal beam, then the person standing in the middle pulls up to the hemp rope. At the same time, standing at the corner node needs to help lift the side triangle so that the strip goes up the slot. When installing the side triangle, be sure to pay attention to the left and right points, do not install the reverse. After pulling the two side triangles, slowly insert the middle seam tube from the lower end between the two side triangles with a piece of stripped strip (the middle seam has a flat iron facing the inside). When you wear to the top node, hang the flat iron into the hanging ear of the top node.
Step 12: Install the curtain
Open the curtain and the front side (with a rope or covered surface) facing outwards. First, insert the strip into the slot on the column. Then slowly pull up to the top, insert the lifting code into the notch of the beam milling slot, pay attention to insert one by one one by one, after plugging, the lower end of the curtain strip is also from the milling groove of the column Push it down, pull the curtain to the middle after the celebration ceremonial tent, and place the rope side behind the awning side, and connect the ropes from top to bottom.
Step 13: Install the cloth top bar
Insert the cloth top pressure bar into the pressure rod sleeve on the top of the cloth (that is, there is a double-layer sleeve at the top of the cloth top, then place the end pressure iron inside the pressure rod, and insert the rectangular screw into the seamless tube of the corner node. .

See How We Fulfill Your Project

Customer expresses intent; Communicate between the two parties; Provide analysis reports to customers; Reach a cooperation intention.